Current sweeping gravel pathpath from front doorEntry at pavementProposal for pathProposal other sideProposal top terraceProposed step/slope displayForming first stepFirst step approvedProgressing step constructionTop terrace nearly finishedTop terrace after jointingJointing of stepsLeft hand steps completeRight hand steps completeStep detailTop Terrace

Winding and sloping stairway with matching terrace

April/May 2013

Our Dundee client wanted to upgrade the current gravelled access paths to a more stable surface. The height difference from door to pavement was 1400mm over a distance of 8 metres. The client did not want too many steps ( 8 would be required) so a solution was required to create a path with steps taking the curve into consideration. A real size display was constructed for the client to "test" before commiting to the project.

 To travel the distance and height over 4 steps, we introduced slopes between each step. The steps would be of standard level construction on the landing and take off over 300mm with a gradient of 150mm over 1700mm between steps. The display proved a success and the client was comfortable to proceed.