«« back
roof complete polycarbonate sheets fittedCurrent interior of the hot tub areanot the best weather to start!!lets dig our holeclay soil under 400 mm of good black earth...handy2 days of JCB work on dig outdig out shape complete to depthquick checksdepth checksconcrete pourre-inforcement of concreteconfirming concrete is levelstart retaining wall buildStructure completeand ready for the big day tomorrow !!The crane arrivesTHe swim spa on its final journeycarefully lowered into the holeSafely in placeterrace roof trusses under constructionbuilding the roofroof progresssurround floor to roof fencing fittedproject exterior framing the sunken tub and swim spanearly there.....Black Limestone Paving down

Transformation of Dog Run to swim spa and Hot Tub

Jan/Apr 2016

Our clients had ordered a 7 metre swim spa and wished to transform the terrace currently used as a dog run into a covered entrertainment area with sunk in swim spa and hot tub and if possible before xmas!!!

A pit 8metres by 4 metres and 1600mm deep would need excavating, thats around 60 tonnes and only for the swim spa!!

 

We offered a design proposal and although works are ongoing it will be tight for xmas...but watch this space...

Well it is now mid February. We did manage to install the swim spa for xmas without the decorations! Meaning, the roof the deck and paving all had to wait until the weather cleared. Progress is now rapid and the project end is in sight