Our clients had ordered a 7 metre swim spa and wished to transform the terrace currently used as a dog run into a covered entrertainment area with sunk in swim spa and hot tub and if possible before xmas!!!

A pit 8metres by 4 metres and 1600mm deep would need excavating, thats around 60 tonnes and only for the swim spa!!

 

We offered a design proposal and although works are ongoing it will be tight for xmas...but watch this space...

Well it is now mid February. We did manage to install the swim spa for xmas without the decorations! Meaning, the roof the deck and paving all had to wait until the weather cleared. Progress is now rapid and the project end is in sight